
This $30 Million, 75,000 sf design uses a precast concrete envelope with plans to commission local Detroit artists to render a mural on the exterior of the building.
The site design has a parklet that connects to the City of Detroit’s Joe Louis Greenway, which is 27.5 mile biking and walking trail that extends from the Detroit Riverfront to Highland Park, Dearborn, and Hamtramck. The space layout includes an interior courtyard where PreK and K students have a protected playground area.